Guides

Guides for clients

Short guides on building design and permits. Every statement is backed by a reference to an act, a regulation or a standard.

Legislation checked 08.10.2026

Guide · 4 min Building permit or building notice: what does your building need? Ground projection area, height and the type of work decide. Tables valid from 01.08.2026. Read the guide Guide · 3 min How long does it take to get a building permit? Statutory time limits from design criteria to the use and occupancy notice. Read the guide Guide · 3 min Preliminary, main and detailed design: what is the difference? Three stages, three purposes: building permit, price quotes and construction. Read the guide

The guides are based on the legislation in force as published in the Riigi Teataja (State Gazette) on 08.10.2026 and on standard EVS 932:2017. A guide does not replace the position of the competent authority. The requirements for a specific building are set by the local authority.

Does your building need a permit?

Write or call us and we will answer directly.

Request a quote +372 5309 1006