Standing seam roofs and sheet metal work

Nool Projekt OÜ installs standing seam metal roofs and does sheet metal work: eaves, ridge and valley flashings, chimney and window flashings, parapet cappings and rainwater systems. We do this on our own construction sites and as a separate job. Survey, measuring, fabrication and installation are handled by one team. We are based in Viljandi and work across Estonia.

What we do

Standing seam roofs

New roofs and replacement of old roof coverings. We install factory-profiled click-lock seam roofs and hand-seamed standing seam roofs, including curved and conical roof sections.

Roof flashings

Eaves, verge, ridge and valley flashings, chimney and wall abutments, roof penetrations.

Window and facade flashings

Window sills, parapet cappings, plinth flashings and other facade details. We measure on site and the flashings are made to the site dimensions.

Rainwater systems

Gutters, downpipes and brackets. Water has to get from the roof to the ground without wetting the facade or the plinth.

Heritage-protected buildings

We restore historic roofs and sheet metal details to their original form and seam the joints by hand. Nool Projekt holds heritage conservation activity notice EMU000600.

Repairs and roof safety

Local repair of leaking joints and damaged flashings. Snow guards, roof walkways and roof ladders.

A seam roof rarely leaks in the middle. It leaks at the junctions.

The eaves, valleys, chimney and penetrations decide whether a roof stays watertight. Our designers and builders work in the same team. We draw a difficult junction before the work starts instead of improvising it on the roof.

Before quoting we check

  • Whether the roof pitch suits the chosen seam type and the manufacturer’s installation instructions.
  • The condition of the battens or boarding and the underlay.
  • Ventilation under the roof covering, so that the space under the metal does not stay wet.
  • The eaves, valley, chimney and penetration junctions.
  • The need for snow guards and roof safety products.

How the work goes

The price, material and deadline are agreed in writing before we go up on the roof.

  1. 01

    We survey the site

    We measure the roof and the details and check the condition of the substructure.

  2. 02

    We prepare a quote

    The quote states the material, colour, quantity, price and deadline. If the battens need repair, we list this separately.

  3. 03

    We install and hand over

    The work follows the agreed plan and the site is left clean. We give a 2-year warranty on workmanship; the manufacturer’s warranty applies to materials.

Our work

A selection of our sheet metal work.

Grey standing seam roof with two chimneys and roof windows on a fieldstone building
Standing seam roof on a fieldstone building
Viljandi Vocational Training Centre (VIKK), Vana-Võidu · 2026
Red standing seam conical tower roof with seams meeting at the apex
Conical tower roof
Vabaduse plats 2, Viljandi · 2025
Red standing seam roof on a half-timbered brick building, installation in progress
New standing seam roof
Outbuilding of a private house · Classic profile · 2023
Eaves and gutter hooks of a grey standing seam roof above an old log building
Eaves and gutter hooks
Private house · Classic profile · 2026
Valley of a red standing seam roof and the junction with a curved dormer
Valley and dormer junction
Vabaduse plats 2, Viljandi · 2025
Brick chimney flashing and its junction with a standing seam roof
Chimney junction
Private house · 2026
Red standing seam cladding on an arched dormer of a historic building
Arched dormer cladding
Vabaduse plats 2, Viljandi · 2025
Roof penetration casing and its junction with a grey standing seam roof
Roof penetration
Viljandi Vocational Training Centre (VIKK), Vana-Võidu · 2026
Installer on a lift next to the standing seam cladding of an arched dormer
Installation
Vabaduse plats 2, Viljandi · 2025

Before and after: roof replacement

Private house with the old roof covering before replacement
Before
Old roof covering
The same house with a new grey standing seam roof
After
Standing seam roof, Classic profile · 2026

Private house. The old roof covering was replaced with a standing seam roof.

Frequently asked questions

All questions
Do you do sheet metal work if I am not ordering construction?

Yes. We also do just the roof or just the sheet metal work, for example a roof replacement, new window sills or a rainwater system.

Can a seam roof replace my old roof?

In most cases, yes. Before quoting we check the battens and the underlay. If they need repair, we list this separately in the quote.

What metal do you use?

Mostly polyester-coated steel, and galvanised steel or copper where needed. On private houses we often use factory-profiled click-lock seam sheets (such as the Classic profile); on historic buildings we seam the joints by hand. We choose together with the client based on the building, the budget and the look they want.

How long does a roof replacement take?

It depends on the roof area, the number of junctions and the weather. We put the deadline in the quote.

How much does a standing seam roof cost?

The price depends on the roof area and pitch, the number of junctions and penetrations, the material and the condition of the battens and underlay. We give an exact price in a written quote after surveying the site.

What warranty do you give?

We give a 2-year warranty on workmanship. The manufacturer’s warranty applies to materials; its length depends on the coating and the manufacturer.

Do you work on heritage-protected buildings?

Yes. Nool Projekt holds heritage conservation activity notice EMU000600. We restore roofs and sheet metal details to their original form and seam the joints by hand. On a listed building or in a heritage conservation area we work under the heritage conditions and with a permit from the National Heritage Board. Example: the building at Vabaduse plats 2 in Viljandi, where we clad the arched dormers and the tower in standing seam metal.

Does your roof need replacing?

Send us the address and a few photos of the roof. We will tell you how to proceed.

Request a quote +372 5309 1006