Frequently asked questions

Short answers to the questions clients ask us most often.

Working together

Do you do both design and construction?

Yes. Design and general contracting are the core business of Nool Projekt OÜ and are carried out by the same team. The client does not have to deal with several different parties. One team, one responsibility, one result.

How does working together start?

First we talk it through: we listen to your needs and explain whether and how we can help. Then we agree on the scope, extent, price and deadlines of the work and put them in writing. After that we get the job done, with management, design and construction following the agreed plan.

Where do you work?

Our office is in Viljandi, at Reinu tee 30. We design and build all over Estonia.

How is the price set?

We agree on the scope, extent, price and deadlines before the work starts and put them in writing.

Design

What kind of design work do you do?

We prepare the architectural and structural parts of the building design and coordinate the principal design. The design is delivered in stages: sketch design, preliminary design, main design and detailed design (EVS 932:2017). We also hold notices of economic activities for traffic management design and electrical work.

Do you work with listed heritage buildings?

Yes. We hold heritage conservation activity notice EMU000600 and have experience in reconstructing and restoring buildings.

Which design stage can be used to apply for a building permit?

The preliminary design is the first stage that can be used to apply for a building permit. Construction work is based on the detailed design. See the guide preliminary, main and detailed design.

Construction

Who is responsible for the construction site?

Construction is managed by construction manager and board member Tiit Aaso. He makes sure the construction stays within the agreed price and schedule.

What kind of buildings do you build?

We have extensive experience with private houses and with the new construction, reconstruction and restoration of buildings.

Permits and time limits

Do I need a building permit?

It depends on the ground projection area, the height and the type of work. A building up to 20 m² and up to 5 m tall needs neither a permit nor a notice. To erect a building of 20–60 m² and up to 5 m tall, a building notice with building design documentation is enough. A building over 60 m² or over 5 m tall needs a building permit. The tables are in the guide building permit or building notice.

How long does the building permit procedure take?

The local authority issues a building permit within 30 days of the application (Building Code § 42(5)). Design criteria also take up to 30 days, or 60 days in an open procedure (Building Code § 31(2)). All time limits are in the guide how long does a building permit take.

Does a detached house need a use and occupancy permit?

No. Under Annex 2 of the Building Code, a use and occupancy notice is enough to start using a detached house or a two-apartment residential building. It is submitted at least 10 days before you start using the building (Building Code § 48(2)).

Company

Do you have ISO certificates?

Yes: ISO 9001:2015 (quality management) and ISO 14001:2015 (environmental management). We use them to plan, carry out and close projects.

How trustworthy is Nool Projekt?

We are an Äripäev Trustworthy Company 2025 and 2026, an Äripäev TOP Company 2025 and a Gazelle Company 2026. We have no debts, and our annual reports and tax returns have been filed on time. Our turnover in 2025 was €1.71 million.

Who owns the company?

All four board members are also shareholders: Jaak Tihane, Janno Järvekülg, Priit Raudla and Tiit Aaso. Responsibility is not spread thin; the owners guarantee it personally.

Didn’t find your answer?

Write or call us and we will answer directly.

Request a quote +372 5309 1006