Architectural design
Nool Projekt OÜ designs the architecture of buildings from sketch design to detailed design. Architect Mart Liho works in the same team as the structural engineers and builders. We are based in Viljandi and design all over Estonia.
What we design
New buildings
Siting, massing, space planning, facades and exterior finishes. We take buildability into account from the start.
Reconstruction
Re-planning an existing building and giving it a new use. We start with a condition survey, the materials and measurements.
Listed heritage buildings
Solutions that preserve the building’s heritage value. Our heritage conservation activity notice is EMU000600.
Building permit documentation
Preliminary design for the building permit application and main design for the budget and the construction tender.
How the design comes together
Every stage starts from input data you have approved and ends with your approval. Each stage builds on the previous one.
Stages according to EVS 932:2017 “Ehitusprojekt”.
- 01
Sketch design
The idea of the building: siting, massing, space planning and exterior finishes. We consider technical feasibility right away.
- 02
Preliminary design
The principles of the solution and the general quality level. The preliminary design is the first stage that can be used to apply for a building permit.
- 03
Main design
A refined solution that is consistent with the structures and building services. The budget and the construction tender are based on it.
- 04
Detailed design
The details and junctions the building is built from. Construction work is based on the detailed design only.
Who does the design
Priit Raudla
I make sure the design is well thought through and runs without surprises.
Civil engineer, level 6 · professional certificate no. 241908
Architect, structural engineer and builder in the same team
When design and construction are in one company’s hands, questions don’t fall between the parties. The client does not have to deal with several different parties. Feedback from the site improves the design and gives fast, flexible solutions.
Design and build under one roofBefore you start
Frequently asked questions
All questionsWhich design stage can be used to apply for a building permit?
The preliminary design is the first stage that can be used to apply for a building permit. Construction work is based on the detailed design. See the guide preliminary, main and detailed design.
Do you design listed heritage buildings?
Yes. We hold heritage conservation activity notice EMU000600 and have experience in reconstructing and restoring buildings.
Can design and construction be ordered together?
Yes. Design and general contracting are carried out by the same team. One team, one responsibility, one result.
Planning a new building or a conversion?
We listen to your needs and explain whether and how we can help.