Certificates and licences

Company details

Business name
Nool Projekt OÜ
Registry code
16183882
VAT number
EE102354120
Founded
15.03.2021
Address
Reinu tee 30, 71020 Viljandi, Estonia
Management board
Priit Raudla, Janno Järvekülg, Jaak Tihane, Tiit Aaso

ISO certificates

ISO 9001:2015 quality management
ISO 14001:2015 environmental management

For us ISO is not a single document but an everyday way of working. We use it to plan, carry out and close projects, which ensures quality, clear organisation and a verifiable process.

ISO 9001:2015 certificate, Nool Projekt OÜ ISO 14001:2015 certificate, Nool Projekt OÜ

Notices of economic activities

Check in the Register of Economic Activities
NumberFieldActivitiesSince
EEP004573DesignArchitectural activities, engineering design04.04.2021
EEH012250Construction—04.04.2021
EMU000600Heritage conservationArchitectural activities, civil engineering works, specialised construction works, etc.08.02.2022
ELK000158Traffic management designEngineering activities18.08.2021
TEL004175Electrical workInstallation of electrical equipment, engineering design18.03.2022

Status as of 07.10.2026.

Professional certificates

Check in the register of professional qualifications
NameRoleProfession and levelSpecialisationCertificateValid until
Tiit AasoConstruction managerConstruction manager, level 6General construction24644908.10.2031
Jaak TihaneChief engineerCivil engineer, level 6Building construction; preparation of building design documentation17399612.07.2028
Janno JärvekülgStructural designChartered civil engineer, level 7Building construction; preparation of building design documentation18090612.04.2029
Civil engineer, level 6Building construction; construction management19960706.06.2030
Mart LihoArchitectChartered architect, level 7–17763115.12.2028
Priit RaudlaDesign project managerCivil engineer, level 6Building construction; design management24190802.06.2033
Construction manager, level 6General construction22123723.01.2030
Construction site manager, level 5General construction works18005724.03.2027
Karli VeelainTechnicianChartered civil engineer, level 7, initial qualificationGeneral constructionE023805no expiry

Status as of 16.10.2026, source: register of professional qualifications. Click a certificate number to open the register entry.

The qualifications were awarded in Estonia under the Professions Act. Under § 24 of the Estonian Building Code, the competent person working for a company that designs or builds structures requiring a building permit must hold a professional qualification. Professional rules: Building Code (Ehitusseadustik), Professions Act (Kutseseadus), in Estonian.

Our principles (ISO 9001 and ISO 14001)

  • We put the client first

    We care about our clients. We follow what clients and other stakeholders expect from our work and improve our activities and management system accordingly.

  • We meet deadlines

    We keep to agreements and deadlines.

  • We work smart

    We keep learning and train our staff.

  • We comply with requirements

    We work in line with the law, the client’s requirements and other requirements that apply to us.

  • We work in an environmentally friendly way

    We make sure our work does not harm the environment and we keep improving our processes.

Our management system is built on these principles