Design
Nool Projekt OÜ prepares building design documentation from sketch design to detailed design. We produce the architectural and structural parts and coordinate the principal design. Our designers work in the same team as our builders. We are based in Viljandi and design all over Estonia.
Parts of the design
Architectural design
Siting, massing, space planning and facades from sketch design to detailed design.
Read moreStructural design
Load-bearing structures for new buildings, reconstruction projects and listed heritage buildings.
Read morePrincipal design
Coordinating the parts of the design so that architecture, structures and building services fit together. Coordinated by Priit Raudla.
How the design comes together
Every stage starts from input data you have approved and ends with your approval. Each stage builds on the previous one.
Stages according to EVS 932:2017 “Ehitusprojekt”.
- 01
Sketch design
The idea of the building and the outline solution. For an existing building we start with a condition survey and measurements.
- 02
Preliminary design
We choose the principles of the solution and the quality level. The preliminary design is the first stage that can be used to apply for a building permit.
- 03
Main design
The solutions are refined and the parts of the design are consistent with each other. The budget and the construction tender are based on the main design.
- 04
Detailed design
Details, junctions and specifications. Construction work is based on the detailed design only.
Who does the design
Mart Liho
Jaak Tihane
Janno Järvekülg
Designers and builders in the same team
When design and construction are in one company’s hands, questions don’t fall between the parties. The client does not have to deal with several different parties. Feedback from the site improves the design and gives fast, flexible solutions.
Design and build under one roofFrequently asked questions
All questionsWhat kind of design work do you do?
We prepare the architectural and structural parts of the building design and coordinate the principal design. The design is delivered in stages: sketch design, preliminary design, main design and detailed design.
Which design stage can be used to apply for a building permit?
The preliminary design is the first stage that can be used to apply for a building permit. Construction work is based on the detailed design.
Can design and construction be ordered together?
Yes. Design and general contracting are carried out by the same team. One team, one responsibility, one result.
Need building design documentation?
We listen to your needs and explain whether and how we can help.