Construction and design are our core focus.
We design, build and manage projects so that your building is completed reliably and on the agreed schedule. Our services combine construction and design into a single process. Our strength is having design and construction capability in one company, which lets us offer fast, flexible solutions that take the client’s wishes and needs into account.
Architectural design
The building from sketch design to building permit. The architect works in the same team as the structural engineers and builders.
Read more: Architectural designStructural design
Load-bearing structures for new buildings, reconstruction projects and listed heritage buildings. Led by chief engineer Jaak Tihane.
Read more: Structural designGeneral contracting
Our aim is to build buildings that are durable, good-looking and delivered with an attitude that keeps the client confident at every stage.
Read more: General contractingDesign and build under one roof
Our strength is having design and construction capability in one company. Feedback from the site improves the design and gives fast, flexible solutions.
Read more: Design and build under one roofWe don’t take on random jobs and we don’t let projects drag on
How we start working together.
- 01
We talk it through
We listen to your needs and explain whether and how we can help.
- 02
We agree on the solution
We agree on the scope, extent, price and deadlines of the work and put them in writing.
- 03
We get the job done
Management, design and construction follow the agreed plan.
One team, one responsibility, one result.
For us it matters that construction and design work as a single whole. Combined, they let us keep the work running smoothly. Founded in 2021, this growing Estonian company employs more than 10 specialists: designers, engineers and builders. We focus on solutions that support the client’s goals.
Our turnover was €1.34 million in 2023, €1.44 million in 2024 and €1.71 million in 2025. The company’s financial position is strong and transparent. We have no debts, our annual reports and tax returns have been filed on time, and the background of the company’s managers is in order. The management board consists of Jaak Tihane, Janno Järvekülg, Priit Raudla and Tiit Aaso.

Construction manager

Structural design

Design project manager

Chief engineer
Before you start building
Three short guides to the questions clients ask most often before a project starts. Every statement is backed by a reference to the law.
Do you do both design and construction?
Yes. Design and general contracting are the core business of Nool Projekt OÜ and are carried out by the same team. The client does not have to deal with several different parties.
Where do you work?
Our office is in Viljandi, at Reinu tee 30. We design and build all over Estonia.
Do you work with listed heritage buildings?
Yes. We hold heritage conservation activity notice EMU000600 and have experience in reconstructing and restoring buildings.
In our work it matters that construction and design function as one integrated process.
We have been recognised as:
- Äripäev Trustworthy Company 2025 and 2026
- Äripäev TOP Company 2025
- Gazelle Company 2026
These awards confirm that we deliver and that our work is stable, high-quality and professional. Construction and design happen in the same team, which makes the result more consistent and clearer.